- non-recurring cost
- non-recurring cost
Those costs that are generally incurred on a one-time basis and include such
costs as plant or equipment relocation, plant rearrangement, special tooling,
special test equipment, preproduction engineering, initial spoilage and rework,
and specialized work force training.
Source: Max Wideman.com
Copyright: Wideman Comparative Glossary
of Common Project Management Terms v3.1 is copyright by R. Max Wideman, March
2002.
Selecteer hieronder het begrip in de taal waarin u verder wil zoeken. Vervolgens verschijnen de beschikbare zoekvragen voor die taal.
Heeft u opmerkingen/suggesties omtrent dit begrip? Klik hier om deze door te geven.