- lowest static baseline
- lowest static baseline
Using the flow down of organizational objectives from corporate values to
project objectives to functional requirements to product design, the LSB is the
lowest level that is relatively fixed for a given project in the hierarchy and
is therefore readily "baseline-able". A term used in the Dynamic Baseline Model
hierarchy in which a project may be positioned. A project can only be expected
to meet its LSB, and therefore success or failure should only realistically be
measured relative to that baseline.
Source: Max Wideman.com
Copyright: Wideman Comparative Glossary
of Common Project Management Terms v3.1 is copyright by R. Max Wideman, March
2002.